. Military Space News .
Athena Review Points to Payload Fairing


Denver - April 29, 1999 -
An Anomaly Investigation Team established by Lockheed Martin Astronautics has determined that, based on telemetry and flight data analysis, the Athena II's payload fairing did not separate properly.

As a result of carrying the extra weight of the payload fairing, the rocket did not achieve sufficient velocity to place the IKONOS 1 satellite into Earth orbit.

The aluminum-lithium payload fairing is used to protect the satellite from aerodynamic friction during the early phases of flight and is designed to separate and fall away from the rocket after it has passed through the atmosphere.

The Lockheed Martin Anomaly Investigation Team has determined that the Thiokol Castor 120� first and second stage solid rocket motors, the Pratt and Whitney Orbus� 21D third stage solid propulsion system and the Orbit Adjust Module propulsion system (which includes the equipment section structure, attitude control system provided by Primex Technologies, and avionics) have been ruled out as possible causes of the failure.

Lockheed Martin is continuing its investigation to determine why the payload fairing did not separate.

  • Athena 2 Data

    Athena 1 + 2 Reports at SpaceDaily

  • Athena Fails To Launch Ikonos 1 Into Orbit
  • Ikonos-1 Lost In Space
  • First Orbital Mission From Kodiak Island Announced
  • Second Athena II to lift delayed Ikonos 1
  • Athena 1 Brightens Florida SpacePort Athena 2 Launches Lunar Probe
  • LockMart Renames LMLV Faimily Athena

    Earth Observation Reports At SpaceDaily

  • EDO Wins Hughes GeoSat Sensor
  • OrbImage Debuts Online EO Catalog
  • SEAKR Wins Naval EO Deal
  • Integral Wins Command Contract
  • Earth Search For Cutthroat Trout
  • Satellites Track Bluefin Tuna
  • OrbView-2 Finishes Strong First Year
  • Earth Search Maps Federal Weeds
  • TRMM Data Live to the Net
  • Racel Tracks Moroccan Fish
  • PlanGraphics Signs EOSAT Distribution
  • Mexico Scanned At 2000 Miles A Day
  • EO Goes Retail
  • Fire Tower In Orbit
  • Canada Targets Quebec EO Services
  • Titan-II To Launch NOAA-K May 13
  • Earth Search Signs Up With EarthWatch
  • Russian Satellite Returns EO Images
  • Orbimage Fully Funds OrbView
  • Orbimage Fully Funds OrbView
  • Lockheed Beefs Up Remote Sensing
  • EUMETSAT Gets Green Light
  • OSC Gets Smallsat Contract
  • Ball Wins Fast Track ICESAT
  • Earth Search In Commercial Overflight
  • Geosat Ready For Saturday Launch
  • Earthwatch May Save Earlybird
  • Antartica Mapped In High Detail
  • Earlybird Calls Home At Last
  • .OrbComm Establishes Leo Eight.
  • Ozone Satellite Redeployed
  • Orbital Wins $8M MiniStar Satellite Contract
  • ORBIMAGE Begins SeaStar Service
  • Kodak Launches EO Imaging Service
  • NASA Awards First Rapid Spacecraft Order
  • India Launches EO Satellite
  • OrbView-2 Sends First Test Images

    Related Links

    Titan Team Ready For Milstar Launch
    Cape Canaveral - April 29, 1999 -
    The Air Force and Lockheed Martin Astronautics launch team is set to launch a Titan IV/B carrying a Milstar satellite from Space Launch Complex 40 at Cape Canaveral this Friday. The April 30 launch window extends from 10:56am to 2:56pm EDT.























  • The content herein, unless otherwise known to be public domain, are Copyright 1995-2006 - SpaceDaily.AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA PortalReports are copyright European Space Agency. All NASA sourced material is public domain. Additionalcopyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement,agreement or approval of any opinions, statements or information provided by SpaceDaily on any Web page published or hosted by SpaceDaily. Privacy Statement